
Job Seeker
Notification
Have user active in the system if you want Login, Press the confirmation button below system will push user previously in the system is Logout immediately, There is no doubt. More Details
Sign in
Employer
Sign in
Job Seeker
Problems login in with Facebook
A system error has occurred at this time, Makes it impossible to log in with Facebook.
Please log in with Username and Password
If forgot your password? You can click the reset password to set your new password.
We are working quickly to resolve this issue.
Sorry for the inconvenience.
Team Jobbkk
Need Urgent Job
How many days do you need urgent job ?
Note : The system will show the status of urgent work to the entrepreneur that You are in need of urgent work for the selected time period. After that, it can be pressed again.
Email Verification
Dear Jobseeker
Email has not yet been confirmed. Please confirm your email to receive notifications about job interview appointments, requests to view application forms, and other news from jobbkk.com.
*Note : Please confirm your account by "7 days" If you do not confirm your email within the specified period, you will not be able to log in.
Contact channel
30,000
- Completed
Vehicles with
- Car
- Motor
driver's license
- Car
Driving Skills
- Car
- Motor
Please Login For Resume Information
1.
Job Categories : Engineering
Job Sub Categories : Maintenance
Job Position : Maintenance Chief
2.
Job Categories : Engineering
Job Sub Categories : Engineering Others
Job Position : Project Coordinator
3.
Job Categories : Technician
Job Sub Categories : Chief/Manager/Management
Job Position : Plant Project Engineer
Job Location : Samut Prakarn (All)
Job Type : Full time
Availability : within 7 days
Willing to work oversea? :
Graduation year : 2007
Certificate : High Vocational
Faculty : Engineering
Major : Computer technique
GPA : 2.45
Graduation year : 2003
Certificate : Vocational
Faculty : Electrical
Major : Electronic technician
GPA : 3.60
Last Position : Construction project manager
Period : February 2023 to February 2024
Job Description :
# Construction Project of Phra Thepwatchirayan (Luem Thithammalo) Hospital
Project Leader: Phra Luem Thithammalo, Abbot of Wat Nong Pong Forest Monastery
Location: Kok Chan Subdistrict, Uthumphon Phisai District, Si Sa Ket Province
Building Capacity: 60 Beds (In-patient and Out-patient)
== Scope of Work and Responsibilities ==
1. **Project Management of Hospital Construction**
- Plan project execution to meet scheduled timelines
- Control budget in accordance with the clients objectives
- Select materials and equipment that are durable and have easily available spare parts
2. **Use of Technology for Design and System Coordination**
- Use 3D software such as SketchUp for preliminary design and clash detection between systems including electrical, plumbing, structural, and MEP
- Plan equipment locations for easy access during maintenance
3. **Coordinate with Relevant Staff to Resolve Details of Systems and Finishes**
- Coordinate with engineering and architectural teams to identify and resolve conflicts between different building systems
- Use SketchUp for Clash Detection between MEP systems, structure, and finishes
- Modify system and finish details using SketchUp, including special furniture such as patient beds and nursing station tables
- Coordinate installation of internal communication system (PABX)
- Verify location of telephone switchboard, internal phone points, and integration with network system
- Adjust design to suit actual usage in hospital settings such as nurse stations, patient rooms, and emergency areas
- Coordinate installation of solar power system (Solar Cell)
- Confirm installation locations of rooftop solar panels and other suitable areas
- Revise electrical design to support connection with main hospital power system (Grid Tie Inverter, MDB)
- Plan safe and maintainable installation
- Coordinate installation of water treatment system
- Check installation positions for water filtration, RO (Reverse Osmosis), and disinfection systems (Ultraviolet / Chlorination)
- Adjust water distribution system for specific departments such as Operating Room, Dialysis Unit, and Laboratory
- Plan for regular maintenance and consistent water quality monitoring
- Aluminum Composite Panel (ACP) for exterior finishing
- Stainless Steel (SUS304/SUS316) for handrails, clean areas, and special equipment
- Dental Unit
- Coordinate with technical staff to plan installation of specialized equipment such as dental chairs and X-ray machines
- Verify positioning of Vacuum, Compressed Air, and dedicated electrical systems
- Adjust design before construction begins
- Sanitary Fixtures System
- Coordinate with staff to design and modify sink systems, fixtures, and water supply across departments such as OPD, IPD, ICU, Operation Room, and Dental Unit
- Ensure fixture placement suits each department's operational needs
- Resolve clashes between piping, electrical lines, and structures before construction
4. **Prepare Bill of Quantities (BOQ)**
- Create detailed lists of materials, equipment, and sanitary fixtures required for the entire construction
- Use 3D-designed drawings for accurate BOM take-off
- Cover all work categories including structural works, MEP systems, interior/exterior finishes, and special works such as ACP, stainless steel, and sanitary fixtures per department
- Prepare Bill of Materials (BOM) alongside BOQ for procurement and future maintenance planning
- Use BOQ and BOM data for cost estimation, budgeting, and purchasing processes
5. **Prepare Payment Certificates (Interim Payment Claims)**
- Based on project progress stages
- Verify installed works and equipment
- Assess readiness of spare parts when necessary
6. **Inspect and Control Construction Quality**
- Receive and inspect incoming materials and equipment according to standards
- Inspect construction quality and related systems such as MEP, fire protection, and access control
7. **Prepare Reports**
- Monthly progress reports
- Problem reports and proposed solutions
- Reports on spare part availability and maintenance issues
8. **Coordinate with Various Departments and Agencies**
- Internal coordination with engineering, finance, and procurement departments
- External coordination with contractors, consultants, and government agencies
- Liaise with manufacturers/suppliers for spare part information and warranty terms
9. **Perform Other Tasks as Assigned by Superiors**
- Support completion of construction works
- Plan long-term maintenance strategy
== Installed Systems in the Hospital ==
- VRF Air Conditioning System (Variable Refrigerant Flow)
- Fire Alarm System
- CCTV Surveillance System
- Public Address System
- Internal Telephone System (PABX)
- Lightning Protection System
- Main Distribution Board (MDB) and Emergency Main Distribution Board (EMDB)
- Controls main power distribution
- Separates normal and emergency circuits
- Connected to backup power systems (UPS / EPS)
- Internet and Network System
- Building Management System (BMS)
- Fire Pump and Sprinkler System
- UPS / EPS / Emergency Lighting
- Access Control System
- Medical Waste Management System
- Critical Area Ventilation System
- Passenger and Patient Elevator System
- Clean Air / HEPA Filter System
- Solar Power System (33 kW)
- Installed on building rooftops
- Integrated with main hospital power system
- Used for general lighting and backup systems
- **Water Treatment System**
- Water Filtration System
- Reverse Osmosis (RO) for purified water
- UV / Chlorination for disinfection
- Water storage and distribution system
- Water quality monitoring system
> All systems are designed for ease of maintenance and spare part replacement
> ACP and stainless steel installations are designed to be aesthetic, durable, and suitable for medical environments
> Dental units are coordinated closely with technical teams using pre-designed plans
> Sanitary fixture systems across departments are adjusted based on technical design
> Solar power system is designed for sustainable and energy-efficient operations
> Water treatment system ensures production of clean and purified water suitable for medical use
== Special Finishing Works ==
- **Aluminum Composite Panels (ACP)**
- Used for exterior decoration such as building walls and hospital signage
- Selected for UV resistance and color durability
- **Stainless Steel Works**
- Installed in critical areas such as operation rooms, ICUs, and public spaces
- SUS304 used as standard grade, SUS316 for high-humidity areas
Last Position : Engineer and Project coordinator
Period : May 2020 to June 2022
Job Description :
1. Design the machine according to the design program or customer's requirements.
Use Sketchup to simulate the machine and the installation position and prepare the initial BOM.
2. Supervise the construction of mechanical engineering electrical engineering, assembling and installing engineering works to meet international standards. to achieve the objectives and goals set
3. Conduct site surveys and survey the area in detail in the construction area with the project team.
4. Participate in hearing the scope of work with the bidders for the contracting work and the procurement of materials and equipment.
5. Attend a meeting before starting work with contractors or traders kick-off meeting.
6. Check the safety program and environment what-if analysis
7. Prepare documents for equipment inspection and tools before being used
8. Check documents Inspection Test Plan
9. Check the Working Procedure Manual document.
10. Check the documents about the job.
11. Check the contractor's work plan.
12. Study the designs used in construction.
13. Verify and propose approval of the list of Spec. materials used in the project to meet the standards and meet the criteria.
14. Supervise the construction as planned.
15. Inspect the job site and report construction problems
16. Installing machines and troubleshooting
17. Contact and coordinate OWNER, CONTRACTOR, purchasing, supplier, as well as solving problems related to other agencies. to support the construction according to the plan
Last Position : Engineer 3rd Party
Period : August 2019 to February 2020
Job Description :
jobs abroad maldives island
Engineering audit
Risks assessment and a preventive plan. and prepare documents for future maintenance in the
project
Assessment units are as follows
1. Diesel fuel pump
2. Generator
3. High and low voltage transformer
4. Sub-unit, power supply system
5. Backup power system
6. Exhaust system to heat exchange system used in boilers.
7. Boiler heat exchangers are used in hot water systems.
8. Desalination system
9. Wastewater treatment
10. Wastewater treatment system
11. Fire protection system
12. Irrigation system
13. Building Management Automation BMS
Last Position : Highly skilled technician and Project Coordinator
Period : July 2016 to September 2017
Job Description :
-Business Water Treatment Management Solutions
-To manage all maintenance function in responsible area such as safety , 5S .
-TO Control subordinates to perform maintenance of machine and utility.
-Preventive Maintenance ,Maintenance Planning.
-Control maintenance costs and spare part cost.
-Coordinate the creation of the new machine with customers.
-Provide equipment for the new project.
-Summary of Mechanical Engineering and Machine Applications PLC,HMI
-Power generation design From the sun Solar cell For the production of sea water is freshwater.
Last Position : maintenance chief
Period : March 2015 to June 2016
Job Description :
-To manage all maintenance function in responsible area such as safety , 5S .
-Drive group to meet day weekly demand requirements following the ISO9001 quality
management system
-TO Control subordinates to perform maintenance of machine and utility.
-Preventive Maintenance ,Maintenance Planning.
-Control maintenance costs and spare part cost.
-Install main MDB system installation and DB load center for new requirements.
-Development of machines and systems such as humidity control Spray AHU, modify and adapt
the system to arm robot painting, Modification. Rectifier power supply.for plating
Modification High power ultrasonic .for plating
Last Position : senior technicianhighly skilled technician
Period : May 2013 to June 2014
Job Description :
-Analyze and repair electronic system equipment used in BTS and MRT trains to ensure normal operation.
Inspect and maintain electric door control systems to ensure smooth and safe operation.
-Monitor and troubleshoot SCADA signaling systems between stations for effective system communication.
-Check and repair electric motor sub-control systems to ensure motors function perfectly.
-Repair electric-powered service vehicles used for towing to keep them ready for use.
-Manage inter-station door opening and closing systems to facilitate operations within the electric train system.
-Perform repairs and improvements on various electrical circuits to restore normal functionality.
-Execute other assigned duties, emphasizing accuracy and efficient teamwork.
Last Position : senior technician
Period : April 2010 to April 2013
Job Description :
Analyze and repair Debug Embed board and Main board and prepare documents for repair technicians Design Testfixture Tech little and take care of other assignments , such as Support Maintboard Diebold ATM.
httpwww.diebold.co.thhome.asp
Support LTX X-Series Platform.
httpsen.wikipedia.orgwikiLTX
Assembly and test Debug For the transmission antenna and signal Indra product.
httpwww.indracompany.comensobre-indracompania-global-de-ti
Removing repair BGA Ball grid array.
httpwww.vjelectronix.comRework20systemsSummit2200.html
Design and test a hot oven Board.
Board and washing machine, etc.
Last Position : senior technician
Period : July 2009 to March 2010
Job Description :
-Research and study various techniques for data recovery from damaged or problematic hard drives to maximize data retrieval success.
-Prepare reports and manuals detailing data recovery processes, result analysis, and troubleshooting guidelines.
Install, configure, and monitor computer systems for bank branches to ensure fast and secure operation.
-Perform other assigned duties meticulously, adhering to established standards, with a focus on teamwork and responsibility.
Institute :
- Premier Products Public Company Limited.Period :
- August 2017 to August 2017Course :
- Basic Solarcell and InverterInstitute :
- EDA International Ltd.Period :
- November 2016 to November 2016Course :
- Basic ScadaVehicles with
- Car
- Motor
driver's license
- Car
Driving Skills
- Car
- Motor
Languages | Speaking | Listening | Reading | Writing |
---|---|---|---|---|
Thai | Good | Good | Good | Good |
English | Medium | Medium | Good | Medium |
Typing Skills
## Work Experience
* **Improvements**
* **Modified AHU HVAC in Paint Rooms**: Implemented automatic humidity control and data logging.
* **Upgraded AHU HVAC Systems**: Converted from manual to SCADA control.
* **Enhanced Cooling Tower Water Filtration**: Installed an automatic backwash system.
* **Optimized Plastic Injection Machine Lubrication**: Programmed for lubricant savings and machine cleanliness.
* **Adapted Plasma Cutting Machine OS**: Supported new mainboards due to obsolete parts.
* **Integrated Inter-Machine Systems**: Prevented mutual damage between different machine types.
* **Design**
* **Designed 9KW 3-Phase Solar Cell System**: For seawater desalination.
* **Developed Water Treatment Systems**: Utilized UF and RO for client proposals.
* **Created PFD (Process Flow Diagram) & P&ID (Piping & Instrumentation Diagram)**: For equipment selection.
* **Designed SOO (Sequence of Operation) & HMI (Human-Machine Interface)**: For PLC department implementation.
* **Field Service**
* **Installed Machinery**: Including plastic injection molding machines and wastewater treatment systems.
* **Performed Maintenance**: On container forklifts and generators during warranty periods.
* **Electronics Repair & Debugging**
* **Repaired & Designed Electronic Circuits for Rail Systems**: This included multiplex signaling communication systems, door control signal and control systems, embedded boards for entry/exit doors, and motor controllers in mobile service vehicles.
* **Repaired Doble Siemens Relay Test Equipment**: And various embedded boards in BTS & MRTA (SIEMENS) systems.
* **Repaired Hotel/Resort Embedded Board Systems**: Such as Jacuzzi systems and centralized heating systems.
* **Repaired Plastic Injection Machine Ancillary Equipment**.
* **Repaired MPPT (Maximum Power Point Tracking) & Solar Inverters**.
* **Other Skills**
* **Proficient in Sketchup & VISIO**: For design, planning, and presentations.
* **Utilized Team Management Applications**: Including Glideapps, Miro, Google Data Studio, Line API, and Google Apps Script.
Job Region Area
JOBBKK.COM © Copyright All Right Reserved