2024
Last Position : Research and Development
Period :
April 2024 to
June 2024
Job Description :
1. Conducted research and development projects on voltage, Vibrator, and Electrostatic Precipitator (ESP).
2. Studied details and prepared technical manuals for each component of the Electrostatic Precipitator (ESP).
3. Collected dust generation data to analyze the energy consumption of production line machinery.
4. Updated equipment operation manuals to ensure correct usage by technicians.
5. Researched and developed the Rapping Hammer and MIGI system for cleaning Electrostatic Precipitators (ESPs) in a thermal power plant.