Job Seeker
Notification
Have user active in the system if you want Login, Press the confirmation button below system will push user previously in the system is Logout immediately, There is no doubt. More Details
Sign in
Employer
Sign in
Job Seeker
Problems login in with Facebook
A system error has occurred at this time, Makes it impossible to log in with Facebook.
Please log in with Username and Password
If forgot your password? You can click the reset password to set your new password.
We are working quickly to resolve this issue.
Sorry for the inconvenience.
Team Jobbkk
Need Urgent Job
How many days do you need urgent job ?
Note : The system will show the status of urgent work to the entrepreneur that You are in need of urgent work for the selected time period. After that, it can be pressed again.
Email Verification
Dear Jobseeker
Email has not yet been confirmed. Please confirm your email to receive notifications about job interview appointments, requests to view application forms, and other news from jobbkk.com.
*Note : Please confirm your account by "7 days" If you do not confirm your email within the specified period, you will not be able to log in.
Contact channel

©All Rights Reserved
Expected Salary 200,000
Military Status - Completed
VehicleVehicles with
- Car
- Motor
driver's license
- Car
- Motor
Driving Skills
- Car
- Motor
Please Login For Resume Information
1.
Job Categories : Management/Manager
Job Sub Categories : Factory Manager
Job Position : Production
2.
Job Categories : Management/Manager
Job Sub Categories : Director
Job Position : Production Planning Manager
3.
Job Categories : Management/Manager
Job Sub Categories : General Manager
Job Position : Maintenance and Improvement Manager
Job Location : Samut Prakarn (All)
Job Type : Full time
Availability : within 30 days
Working Bangkok : Yes
Graduation year : 2016
Certificate : Master's Degree
Faculty : Master of Business Administration M.B.A
Major : Industrial Management
GPA : 3.47
Graduation year : 1998
Certificate : Bachelor's Degree
Faculty : Faculty of Industrial Education
Major : Electrical Engineering
GPA : 2.34
Graduation year : 1996
Certificate : High Vocational
Faculty : Electronic
Major : Electronic
GPA : 2.90
Last Position : Plant Operation Manager
Period : November 2019 to Present
Job Description :
- Managing and control each department (SHE, QA, Production, Logistic and Process improvement) to get KPIs target. - Provide vision and direction to all plant staff and hourly employees through personal contact, effective programs and policies and mentoring of key staff. - Direct and manage plant operations for production, quality, delivery, shipping and receiving. - Coordinate and oversee all plant activities through effective planning and delegation to the plant staff (departmental managers) to insure operational objectives are met. - Develops annual operating budget and plan including cost improvements in line with our long range plans and objectives. - Implement effective systems to control capital, operating and maintenance expenditures. - Ensure compliance with corporate guidelines on employee health and safety, including OSHA compliance. - Ensure compliance with corporate guidelines on environmental protection. - Drive continuous improvements in all processes and all departments. - Develop talent pool sufficient to meet current and planned needs of the facilities through effective recruiting, training coaching and discipline of employees. - Timely and accurate reporting of necessary operational issues to management (monthly report). Successful Projects/Achievements: - Improvement total logistic cost/sales amount from 2.63% to 2.37%. - RED stock value reduction from 20 million Baht to 4.5 million Baht. - Slow moving stock value/total stock value reduction 20% from 7.52% to 6.02%. - Inventory turnover reduction (ITO Days) 17% from 97 days to 80 days. - Improvement environment and working area for SHE via arrange new traffic management in plant and plant pot from sludge. - Organization and promote that can got accreditation for standard ISO45001:2018 form SGS. - Organization and promote that can got accreditation for standard Carbon Footprint of Product (CFP) from Thailand Greenhouse Gas Management Organization (TGO).
Last Position : Plant Manager
Period : April 2018 to November 2019
Job Description :
HESQ - Lead and work in accordance with relevant legislation, Company Health and Safety Policy, Yara Safety Principles and the Golden Rules. - Follow and promote the Safety by Choice philosophy in all operation and activities on site. - Maintain procedure and risk assessment relevant to the area of responsibility and local regulatory. - Respond to actions related to HESQ within the deadline. - Provide guidance and leadership to all subordinates in safety awareness. Production - Ensure that products are bagged per the production plan in a cost effective manner. - Improve the operation process and apply the Yara Productivity System. - Bagging finished product to satisfies both legal and quality requirement in order to guarantee compliance with regulations and customer satisfaction. Asset Care - Develop procedure for Asset Care and maintenance program, ensuring that all mandatory requirements per Best Practiced and implemented. - All equipment shall be reliable, safety to operate, prevented any environmental incident and guarantee product quality. Warehouse - Manage the Contact by monitoring agreed KPIs to ensure smooth operation in warehouse and in accordance with Yara operational and HESQ standard. - Work with contractor to implement continuous improvement in warehouse operation. Financial - Plan, Monitor and control fixed and variable cost budget for the safe, reliable and efficient running of the site both bagging and warehouse in order to establish cost effective operation. - Source supplier of goods and services with procurement to get competitive rates, through negotiation and specification in order to obtain quality products or labor for the use in bagging and maintenance programs. - Control raw and packing material stocks in efficient in manner in order to ensure economic utilization of working capital. People Management - Organize, train, develop and motivate the bagging team in order to achieve department objective. Successful Projects/Achievements: - Improvement environment and working area for HESQ via make risk assessment according process mapping from 50% to 95%. - Improvement OEE from 45% to 55% - CRC cost reduction 20% from 3.64 million to 2.91 million. - PVC cost reduction 15% from 14 million to 11.90 million.
Last Position : Production Manager
Period : January 2015 to March 2018
Job Description :
Part I : New set up - Organize and planning the 4 M that for supporting the new plant production. - Set organization for supporting production department although recruitment and selection the employees each position. - Organize and establish about job description each position. - Organize and following to establish the documents such as work instruction, quality procedure, quality control plan, check sheet form, reference document and the quality system. - Arrange training schedule plan such as orientation, discipline or regulation of company, 5S, Safety, KYT, 4RKY and work instruction each process. - Organize new tooling maintenance, safety equipment and laboratory through ordering and following. - Organize and co-ordinate the supplier must delivery all tooling and equipment follow up schedule plan. - Leading that use influence or convince to motivate subordinates that go to one goals one team and work together. - Controlling that monitor and follow up all activities and make corrections and preventive action for fixing the problems. Part II : After New Set Up Manufacturing / Operations: - Organize and follow up the section in order to meet the section manufacturing targets of production yields, man and machine efficiency, meeting production schedules and cost. - Organize, ensure and then follow up his/her subordinates for proper and adequate maintenance both documentation and practically of all machinery, tools and equipment within the responsible section including stock management of spare parts and necessary operating supplies. - Organize, ensure and then follow up that all production procedures, job descriptions, specifications, machinery requirements and maintenance are followed according to the establish documents and specifications. - Responsible for control / follow up on quality of the produced product within the responsible section are according to company requirement and specifications. Production Scheduling and Material Control: - Responsible for production scheduling and follow up within the responsible section in order to meet the section-manufacturing requirements. - Responsible for contact and contract amendment directly with internal and external customer within the responsible section and as define in the establish documents and specification. - Responsible for inventory control of all work-in-process within the responsible section in order to have effective production continuity and least possible cost. - Responsible for direct purchasing from suppliers for necessary materials and operating supplies within the responsible section which are not supplied by other Sekisui locations according to Sekisui Specialty Chemicals (Thailand) Co., Ltd. regulations. Manpower Management: - Responsible for manpower planning, forecast and actual hiring following the company policy and strategy considering the optimum solutions for production, quality, schedule and cost. - Responsible for manpower, within responsible section, follows production procedures and job descriptions, basic disciplines and company regulations. - Responsible for the manpower efficiency and quality. New Experienced/Learning: - Training production process for CPVC compound and pellet (Premix, Hot and Cold mixing and Extruder machine) at Taiwan. - Understood for Industrial Estate Authorize of Thailand (IEAT) Process about permits for new factory. - Understood steps in establishing new plant which has civil and building work, mechanical completion, pre-commissioning, commissioning and test operation. Successful Projects/Achievements: - Established new plant factory. - Reduce resin product loss that can save cost about 0.91 million Baht. - Organization and promote that can got accreditation for standard ISO14001:2015 form BUREAU VIRITUS. - Advice company for building inhouse warehouse for reduction storage and transportation cost that can save cost about 1.8 million Baht.
Last Position : Production Manager
Period : February 2013 to January 2015
Job Description :
- Organize subordinate to produce the production correctly operate and effectiveness. - Organize and control the manpower, machine, material and method for suitable to produce the production. - Review and improve internal management for modern situation. - Develop and improve cost and expense to lowest and height quality. - Improve process, machines and tools in production line in suitable condition and effectiveness. - Careful and controlling subordinate for following objective of production and discipline of company. - Promote and support the activity for improvement that company define such as QCC, CCCF, TCC, Kaisen, 5S, SDW, LRP and Safety. - Allocate training course for development the subordinate always. - Summarize production performance report every month. - Define and promote the safety policy of company. Successful Projects/Achievements: - Re layout the product line Toyota Model 520W that can save cost around 12.8 million Baht. - Energy saving that can save cost around 0.97 million Baht. - Productivity improvement by balance manpower and re layout machines that can save cost around 3.9 million Baht. - Machine utilization for Volvo Produce P9103 for supporting volume ramp up about 200% that can save cost around 15 million Baht. - Reduction expense and usage for production that can save about 1.9 million Baht. - WE (Work Error) improvement for production line that can save about 5.9 million Baht. - Improvement environment and safety place for working. - Get the best practice about 5S activity 2014 of all Summit Auto Group.
Last Position : Assistance Manager
Period : January 2008 to January 2013
Job Description :
- Organize subordinate to set up machine correctly, repair and maintenance machine and tools according to the schedule and also the machine monitoring. - Organize and control the machine, tools and operating supplies in production line and technician room are in good condition and well keeping. - Control the quantity of spare parts and tooling stock are enough for supporting the production line. - Control the machine down time and improve and modified the machine and tools for increasing productivity and quality. - Organize new line layout through ordering and set up machine and tools for increasing the demand of production line. - Organize and co-ordinate for the project of machine and tools. - Control and ensure correctly set up and maintenance the machine in the assembly line and following to the established document and the quality system. - Analysis the problem of process for corrective and preventive. - Improvement and development for yield efficiency and quality. - Careful and controlling subordinate (Engineer 2 persons and Technician 13 persons) for following objective of production and discipline of company. Successful Projects/Achievements: - Establish manufacturing production line for Shinola Detroit USA that follow UL standard. - Hand setting machine for caliber 5000 from Fujicon Singapore. - Establish manufacturing production line for caliber 5000, 7000 and 3500. - Establish Automatic Testing Machine (ATM) that can save cost around 2 million Baht. - Establish Automatic Dial Support Machine for caliber 5000, 6000 and 7000. - Improvement Stamping Machine from manual to semi-automatic.
Last Position : Supervisor
Period : April 2003 to December 2007
Job Description :
- Organize the production resources according to production planning. - To solve and improvement process for evolution of quality and efficiency. - Careful and controlling subordinate (5 Leaders and 150 operators) for following objective of production and discipline of company. Successful Projects/Achievements: - Improve standard time operation Train Wheel Bridge, Mechanism and Calendar Assembly. - Reduce cut coil from work man ship. - Improve WIP for increasing efficiency and reduce materials in process.
Last Position : Supervisor
Period : January 2000 to March 2003
Job Description :
MAOI (Mass Lamination Automatic Optical Inspection) Section is Inner Layer Inspection. PAOI (Production Automatic Inspection) Section is Outer Layer Inspection. - Control and improve inspection performance. - Follow up the corrective and preventive action of the supplier when machine breakdown. - Summarize the supplier by monthly performance rating inform to concern section. - Control acceptable standard of the products according to IPC-A-600 or customer requirement. - Control yield according to the target. - Training and improve quality manpower amount 40 persons and 15 machines. Successful Projects/Achievements: - Training knowledge Laser inspection PCB board from Taiwan to leaders and operators. - Inspection PCB board by 100% CAD program. - Reduce downtime machine by control critical spare parts.
Last Position : Engineer
Period : July 1998 to December 1999
Job Description :
- Preventive maintenance CNC Machine and Machining Center. - Reduce downtime machine. - Improve machine for increasing the capacity. - Training and improve knowledge for Technicians. Successful Projects/Achievements: - Overhaul CNC machine. - Reduce downtime machine.
Institute :
- Pintong GroupPeriod :
- June 2014 to June 2014Course :
- Safety Training Level ManagementInstitute :
- by Mr. Pradit WongmaneerungPeriod :
- March 2011 to July 2011Course :
- Single Minutes Exchange of Die(SMED)Institute :
- Crescom Production Inc.Period :
- August 2008 to September 2009Course :
- The Bullet Proof Manager Training Session OverviewsInstitute :
- Thailand Productivity InstitutePeriod :
- December 2006 to December 2006Course :
- Technical Industrial Engineering for Increasing Productivity (Lean System)Institute :
- SGS(Thailand) Co.,LtdPeriod :
- November 2004 to November 2004Course :
- ISO 9001:2000 Internal Quality AuditVehicles with
- Car
- Motor
driver's license
- Car
- Motor
Driving Skills
- Car
- Motor
| Languages | Speaking | Listening | Reading | Writing |
|---|---|---|---|---|
| Thai | Excellent | Excellent | Excellent | Excellent |
| English | Good | Good | Good | Good |
Typing Skills
- Mr.Peerapol Wilaiwongsatient (Current Boss)
SUMMIT AUTO SEATS INDUSTRY CO., LTD
tel.080 9002360
Select Template
Professional template
Formal, suitable for professionals
Classice template
Standard format, easy to read
Coming Soon
New templates coming soon
Job Region Area
JOBBKK.COM © Copyright All Right Reserved