2562
ตำแหน่งงาน : Senior Planning Engineer
ระยะเวลา :
มกราคม 2562 ถึง
ปัจจุบัน
รายละเอียดงาน :
Analyzing order volume classified by articles with existing resources during pre – BUY stage in order to provide feedback in return to head quarter. • In charge of Supply and Demand management, being a representative to negotiate with KEEN US regarding expected orders received against potentially real capacity of factory, taking care of order balancing. presenting the actual situation of the factory together with offering ramp-up & ramp-down plans. • Managing factory capacity with demands regarding Cemented and Direct injection product groups to ensure things are going smoothly. • Making a simulation for management level to make a decision based on suggested options in order to face against challenges. Scheduling Long-Range plan (12 months), Medium Range plan (3-6 months), as well as Monthly (4 weeks), Weekly (2 weeks ahead) and Daily plan for Cutting, Stitching, Cemented as well as direct injection parts. • Maximizing Desma machine utilization with maximum output, also optimizing machine down time. • Engaging with IE to identify the bottlenecks of the entire process with an attempt to eliminate it in order to improve efficiency and productivity. • Managing and controlling Material Requirement dept. (MRP) to get expected raw materials arrival week to match it up with current demand and attempting to minimize current on-hand stock as much as possible. • Follow up tooling investment and article approval. Also, Reviewing on-hand tooling in case of insufficient resources. • Monitoring daily production output and make delivery shipment details.